May 3-4, 2027 | The Hotel UMD, College Park, Maryland

Panel: Mission Assurance — Resilience, Performance, Cost (FinOps), and Contracting Tradeoffs (R13a)

A closing panel dedicated to the hard tradeoffs

Panel: Mission Assurance — Resilience, Performance, Cost (FinOps), and Contracting Tradeoffs (R13a)

A closing panel dedicated to the hard tradeoffs: controlling spend without breaking mission performance, designing resilience that survives dependency failures, and writing contracts/SLA language that can be monitored and enforced continuously (not just promised).